Title: 2 meters mask UV sterilization
Keywords:UV sterilizer,mask sterilizer,mask sterilization machine
QUICK DETAILS:
Model: 2 meters
Brand: FILL-PACK
Power: 1.5kw
Voltage: 220V 1PH 50HZ or customized
Driven force type: Electrical
Automation degree: Automatic
Dimension: 2000*730*1250mm
Weight:80kg
Application: used in hospitals, food, tea food and beverage processing etc.
Condition: New
PROPERTIES:
Capacity: 2800 pieces per hour
Key material: SUS304
Origin: ZhangJiaGang, China
After sales service: Engineers avaliable to service overseas
Qualification: CE, ISO9001-2008
Product working principle:
The UV germicidal band is mainly between 200 and 300nm, of which 253.7nm wavelength is the most powerful. When various bacterial viruses in water or air pass through the UV (253.7nm wavelength) irradiated area, the UV penetrates the cell membrane and nucleus of the microorganism, breaking the molecular bonds of nucleic acids (DNA or RNA), rendering them incompetent or inactive and dead, thus killing all bacterial viruses without the use of any chemicals.
Sterilization efficiency :
Ultraviolet disinfection technology offers unparalleled sterilization efficiency. The sterilization efficiency can be 99%-99.9%. The table below shows that UV technology generally takes less than 1 second to kill several common bacterial viruses.
Product characteristic :
1.Even water flow, no dead space, good light conditions, thorough sterilization, low energy consumption, flexible and convenient installation
2.The main body material is stainless steel, no metal ion contamination problems, the product structure is closed container quartz sleeve type, built-in electrical control device.
3.Theoretical life of UV lamps is up to 10,000 hours, reaching the international advanced level.
4.Beautiful appearance, compact structure, easy operation and maintenance.
Technical Paramters:
Sterilization parameters :
Packing: Wooden case packing.
Delivery Time: 30-35 working days after down payment.
Installation:
A. After the machines are delivered to customer’s factory, please arrange preparation work mentioned in advance;
B. If you needed, We will send technicians to the factory after preparation work is completed; Based on the buyer prepare to all the water, electricity, wire and other conditions, the testing will be finished in a week.
C. Technicians will be responsible for guide on-site installation and testing machines.
D. Meanwhile technicians will give free training lessons to labors during testing here.
E. The customer should be responsible for the room, meals and board and the two-way air tickets and visa and fee as well the allowance 100 USD per day for each person. And should be also responsible for the engineer’s personal safety.
Guarantee period and after-sales services
A. Warranty for machinery: one year for all machinery from shipment date.
B. During this guarantee period, We will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, We will provide the buyer spare parts at cost price.
C. The workers must operate the machines according to the usage of the machine. We do not be responsible for the accident which is made by the improper operation of workers. And for all the force majeure can’t be controlled,avoided and prevented, such as the natural disaster, strike, and earthquake and so on.
Copyright © ZhangJiaGang City FILL-PACK Machinery CO., LTD. All Rights Reserved Technical Support:
Sitemap